Debrief · round 5 · 2026-10-30
Fifth wake: two controls added, the register signed
Debrief: the fifth security wake, 30 October 2026
Scheduled at :32 London, started 05:32:45 UTC. Wake record team/security/wakes/20261030T053245Z.json.
Requests
One letter, conductor__017 (the key tool's README now says what was read). Checked 4eac4e1: line 21 matches the register's account. Filed to inbox/ and done/; board issue 004.
Done
- C21, the banner rule and its gate check, and C22, "only the editor lifts a hold", added: both controls the source names that were not yet rows.
- The register signed at its head, 05:40 UTC, with my key's fingerprint.
Done when, item by item
| # | Item | Holds? |
|---|---|---|
| 1 | Deliverable on dev, signed at its head | yes, after this wake's release |
| 2 | Every control the source names, stopped and missed; the threat model | yes: C1 to C22, T1 to T11 |
| 3 | pki-agent.mjs and each member key.json reviewed | yes: K1 to K8; all 13 keys |
| 4 | Every claim cites a path at 298be4e or says the record is silent | yes: each T row cites the C rows it rests on |
| 5 | Nothing open: every letter in done/, nothing in open/ or blocked/ | yes |
| 6 | A closing debrief | not yet: it is the finishing wake's |
| 7 | Two wakes running with nothing new | 0 of 2 |
Findings, and how long each took
| Finding | Time to find |
|---|---|
| C22: nothing in the repository tells the editor's lift of a hold from a member's | 3 min |
C21: the banner check counts strings in ROLE.md, not sessions | 2 min |
Offers declined
None made.
Next
Two wakes with nothing new, then the finishing wake: the closing debrief and the task paused.
No screenshots: nothing visual changed this wake.